The Federal Government has announced that it has opened bids for the construction of a 4000 MW nuclear power plant.
This was disclosed by Dr Yau Idris, Director General, Nigerian Nuclear Regulatory Authority (NNRA), at the ongoing Nigerian International Energy Summit (NIES) in Abuja.
According to him, the plant would be the largest power plant in Nigeria if the bids are successful and construction is completed.